Monday, 30 May 2011
11/MAY/2011
On Wednesday we worked on the soffit. Me and Cory went up on the scaffolds. marking out how long the gap was so we could fit the soffit in, and witch parts to cut on the soffit, we also had to mark out on to the soffit, were the rafters lined up and so we know were we are going to nail the soffit. after we did that we started doing our vermin proof. I had to make sure that the vermin proof had a 10mm over hang on the outside of the bottom. then after i did that me, Linoel, Corey and Sam worked on the back of our house. doing the back wall (colour steel cladding). 1st we measured how far apart we were going to drill the wholes. we put all the tiles on top of each tile so we can predrilled the holes. we used a battery drill. then after we drilled the hole we put them up on the back wall one by one and used a air drill to drill the tiles up onto the back wall. we finished all this before lunch time.