- 1st we set out our profiles/barriers
- we had to find our datum point
- set out dumpy level
- we marked the heights on the profiles.
- set up batter boards to the bottom of the marks.
- set out stringline for locating the four cornersof the house.
- set out ground plate with a 50mm offset
- pin ground plate with hilty
- measure the piles from the stringline to the ground plate.
- fixed and braced piles
- 50mm from edge then 200mm offset lamanating bearers.
- fixed bearers to piles.
- set out our double joist.(mark 600 in from each end of a double joist)
- we transferd the marks from back joist to front to keep them paralell
- block and line to straghten back joist
- nail on side joist
- 3/4/5-square the joist up
- fixed front joist
- block and line front joist
- measured/cut/fixed in place
carpentry
Monday, 11 April 2011
FLOOR FRAMING