carpentry

carpentry

Monday 4 April 2011

PICTURES OF ME AND MY BOYS WORKING.


THIS IS US USING THE DUMPY LEVEL

 THATS ME ON THE GROND MARKING OUT OUR DATUM POINT. USING THE DUMPY LEVEL TO GUIDE THE STICK THAT WE'RE HOLDING.
 THATS ME AND MY BOYS. I WAS THE BOSS FOR OUR FRONT WALL.
 SOME OF THE BOYS ACTING LIKE THEIR DOING WORK
 THIS IS MY GROUP GETTING READY TO CUT UP OUR PIECES OF WOOD FOR OUR JOIST'S.
 BRANDON ON THE SKILLY (SKILL SAW)

 THE BOYS STANDING AROUND AND PUTTING THE PIECES OF WOOD ON TO THE SAW STOOL.

 THE BOYS DISCUSING A WAY TO CUT OUR PIECES OF WOOD
 THIS IS ME INSTRUCTING THE BOYS TO DO A 20mm OFFSET. AND THE OTHER BYS ARE STRAGHTENING OUT THEIR BENT NAILS. 


 THE BOYS SETTING OUT OUR FLOOR SET OUT 
 THATS ME HOLDING THE SPIRIT LEVEL
 MY FRIEND MOE GETTING INTROUBLE FROM BJORN LOL
 SOME OF MY GROUP SETTING OUT OUR STRIGLINES.
 THIS IS US SETTING OUT OUR BACK WALL FRAMING

 MY GROUP WORKING HARD AS ALWAYS.


 THE BOYS MEASURING TWICE AND CUTTING ONCE.
 SETTING OUT OUR BOUNDRIES

No comments:

Post a Comment